T I L T S

 











All Objects

Combined-cycle gas turbine plant in Elektrenai, Lithuania


Latvian National Library


Vairoga overpass







South bridge construction
The Southern Bridge is presently the biggest construction project in Latvia and its capital city - Riga. In terms of work volume it can only be compared to the Salu tilts (Island Bridge) that was built in the seventies.


The Bridge across River Gauja on route Adazhi - Kadaga
The Bridge across River Gauja on route Adazhi – Kadaga. Design engineer – ZTF “Inženierbūve”, Riga. Total length – 137 m. Driveway width – 8 m, two sidewalks and a cycle path. The pretensioned continuous reinforced-concrete superstructure is supported by five bridge abutments. The main river span of 80 m represents a steel tubular arch (pipe diameter 812 mm, wall thickness 16 mm) and steel pipe cross beams (pipe diameter 500 mm, wall thickness 20 mm) that support the prestressed reinforced-concrete superstructure by means of adjustable steel hangers.


Shopping and entertainment center Riga Plaza


Saulkrasti bypass road


Adazhi bridge across A1 road




















The bridge span reconstruction in Bolderaya in year 2001.


Stony bridge.


Reconstruction of the air bridge in the Brivibas street.


Building of new bridge span in Daugavpils.


Tilts pāri Dubnas upei Līvānos


The bridge reconstruction across the channel Sarkandaugava in G.Dambis street.


Bridge span reconstruction across the railway track in Kalnciema street.


The bridge reconstruction across the Nereta river.


Reconstruction of the overbridge N1 at the entrance to the island bridge

































 


phone: +371 67467919, fax: +371 67466159, e-mail: sekretare@tilts.lv  


 

era