T I L T S

 











Responses

Infrastructure DepartmentAgency

Infrastructure DepartmentAgency
Ref: Span structure reinforcement of the metal bridge across the Lielupe River , Riga-Jelgava ( B -type), 43 km.



In accordance with the contracts signed by TILTS, Ltd and LATVIJAS DZEICELS joint stock venture of Infrastructure Agency, during the period from 1999 to March 2002 TILTS, Ltd performed the span structure reinforcement of the metal bridge across the Lielupe River, Riga-Jelgava (B - type) 43 km.

(3x54.34m scheme), as well as the longitudinal and cross beams replacement and reinforcement of cross beams.

The high quality span reinforcement design was elaborated by TILTS, Ltd design group.

The span carriageway reinforcement works, the pavement consoles (brackets) repairs and replacement, surveying devices production and the paintwork were performed in accordance with the design, schedule and quality requirements, meeting the building standards and regulations.



<<< back to responses list

 


phone: +371 67467919, fax: +371 67466159, e-mail: sekretare@tilts.lv  


 

era