T I L T S

 











All Objects

Construction of the new bridge over the river Dubna in Livani.

Construction of the span structure was performed by moving it longitudinally along the axis of the bridge using jacks and then placing it onto the bearings. Carriageway slab was made of cast in-situ concrete


<<< back to objects list

 


phone: +371 67467919, fax: +371 67466159, e-mail: sekretare@tilts.lv  


 

era